Friday, October 16, 2026

    LG joins NVIDIA partner network to advance AI Data Centre cooling solutions

    0
    6

    NAIROBI, Kenya, October 15, 2026 — LG Electronics (LG) has joined the NVIDIA Partner Network (NPN) as a Power and Cooling Solution Preferred Partner, strengthening the position of its cooling technologies in supporting the thermal demands of high-density AI data centers.

    AI-driven data centers require greater cooling efficiency to manage rising thermal loads, which are now being addressed by LG’s expanding portfolio of highly efficient liquid cooling solutions. LG’s data center solutions are designed to be integrated during the early stages of facility planning, providing a clear basis for the design of cooling systems and supporting infrastructure. This approach supports the delivery of infrastructure that meets the power and thermal management requirements of next-generation AI factories.

    LG’s 2.6-megawatt Coolant Distribution Unit (CDU) has qualified as an NVIDIA DSX Ready CDU and currently offers the largest cooling capacity among NVIDIA’s DSX Ready CDU partners.1 LG has also completed the infrastructure qualification of the 600kW and 1MW, satisfying rigorous technical criteria covering cooling performance, failover capabilities and reliability. These NVIDIA qualifications demonstrate the company’s expertise in liquid cooling across multiple stages of high-density AI infrastructure while highlighting the high efficiency and reliability of its liquid cooling solutions for global hyperscalers.

    LG’s CDUs are engineered to manage the considerable thermal demands of AI infrastructure. Implementing a direct-to-chip (DTC) liquid cooling solution that delivers coolant directly to the CPU, GPU and other heat-generating components, the units operate in synergy with existing air-cooling infrastructure to create a highly efficient hybrid cooling system. LG’s CDUs that have completed NVIDIA AI infrastructure qualification will be showcased at Data Centre World Asia 2026 (DCWA 2026), held September 29–30 at Marina Bay Sands in Singapore.

    By the end of this year, LG plans to pursue NVIDIA qualification for its 4.0MW CDU model, reinforcing the quality of its growing portfolio of liquid cooling solutions for next-generation AI data centers.

    “Joining the NVIDIA Partner Network as a Power and Cooling Preferred Partner is a pivotal step in our strategy to support the expansion of the global AI ecosystem,” said James Lee, president of the LG ES Company. “Together with NVIDIA, LG will help shape the future of AI data centers by delivering advanced cooling solutions that address the industry’s most critical thermal challenges.”

    1 Based on the time shown on the NVIDIA marketplace.

    LEAVE A REPLY

    Please enter your comment!
    Please enter your name here

    error: Content is protected !!